Dear Members,
As per my information :
MODEL RULES UNDER THE FACTORIES ACT, 1948 (Corrected upto 31-3-1987)
CHAPTER I
5. Certificate of Stability.-
(1) No manufacturing process shall be carried on in any building of a factory constructed, reconstructed or extended, or in any building which has been taken into use as a factory or part of a factory until a certificate of stability in respect of that building in the form given below has been sent by the occupier or manager of the factory to the Chief Inspector, and accepted by him.
***A Form of Certificate of Stability is as below.
Form of Certificate of Stability
1. Name of the Factory :
2. Village, town and district
in which the factory is situated :
3. Full postal address of the factory. :
4. Name of the occupier of the factory :
5. Nature of manufacturing process to be carried on in the factory :
6. Number of floors on which workers will be employed :
I certify that I have inspected the building/buildings, the plans of which have been approved by the Chief Inspector in his letter No.... ............ dated ......... and examined the various parts including the foundations with special reference to the machine, plant etc., that have been installed. I am of the opinion that the building/buildings which has/have been constructed/reconstructed/extended/taken into use is/are in accordance with the plans approved by the Chief Inspector in his letter mentioned above, that it is/they are structurally sound and that its/their stability will not be endangered by its/their use as factory/part of a factory for the manufacture of .......... for which the machinery, plant, etc. installed are intended.
Signature ..............................
Qualifications .........................
Address ...............................
Date .................................
If employed by a company or association, )
name and address of the company or )
association )
(2) The Certificate of Stability referred to in sub-rule (1) shall be signed by a competent person.
Regards.
Jawed Alam