Good Day, I would like to seek advice on how to avoid having excess manpower in daily factory operations.
Forecasting sick leave in factory operations
For example, I have 100 machines and 100 staff, and all these machines need to be operated daily. Staff are allowed to take sick leave, so how can I forecast the number of sick leaves on a daily basis? I need to ensure that all these machines can still be operated even with staff on last-minute sick leave, without having too much excess manpower on standby.
Methods for forecasting sick leave
Are there any formulas or types of records that I should be looking into for this forecasting? Should I track the monthly sick leave records to determine on which days the staff took sick leave?
Please advise.
Have a nice day.
Kevin.
Forecasting sick leave in factory operations
For example, I have 100 machines and 100 staff, and all these machines need to be operated daily. Staff are allowed to take sick leave, so how can I forecast the number of sick leaves on a daily basis? I need to ensure that all these machines can still be operated even with staff on last-minute sick leave, without having too much excess manpower on standby.
Methods for forecasting sick leave
Are there any formulas or types of records that I should be looking into for this forecasting? Should I track the monthly sick leave records to determine on which days the staff took sick leave?
Please advise.
Have a nice day.
Kevin.