How Do You Set Effective KPIs and KRAs for Steel Fabrication Roles Like Welders and Fitters?

syed-sadaqathullah
Hi, recently I joined a steel contractor, and they want to create KPIs and KRAs for steel fabrication labor. Kindly share the formats for a steel fabricator, fitter, painter, welder, helper, and foreman.
nanu1953
Foreman KPIs and KRAs

A foreman is a supervisory staff member, and his KRA and KPI should be based on his expected deliverables as decided by the management according to the nature of his job.

KPIs and KRAs for Fabricators, Welders, Fitters, and Helpers

Fabricators, welders, fitters, helpers, etc., may have their KRA and KPI determined by their Daily Routine Work (DRW) and other criteria such as attendance, punctuality, behavior, etc.

Regards, S K Bandyopadhyay (WB, Howrah)

CEO-USD HR Solutions

[Phone Number Removed For Privacy-Reasons]

[Email Removed For Privacy Reasons]

www.usdhrs.in
raghunath_bv
Hi Syed Sadqatfhullah,

Certainly! Key Performance Indicators (KPIs) and Key Result Areas (KRAs) are essential tools for measuring and evaluating the performance of employees in any industry. For a steel fabrication labor team, here are some suggested KPIs and KRAs for different roles:

Steel Fabricator:

KPIs:
- Production Output (measured in tons or units)
- Fabrication Accuracy (% of pieces meeting specifications)
- Safety Incidents (number of incidents)
- Waste Reduction (scrap material percentage)
- On-time Delivery (% of projects completed on schedule)

KRAs:
- Fabrication Quality Assurance
- Safety Compliance
- Productivity and Efficiency
- Process Improvement Initiatives
- Material Utilization

Format:
KPI: Production Output
Target: 100 tons per month
Actual: 110 tons per month
Variance: +10%

KPI: Fabrication Accuracy
Target: 95%
Actual: 96%
Variance: +1%

KPI: Safety Incidents
Target: 0 incidents
Actual: 2 incidents
Variance: -2 incidents

Fitter:

KPIs:
- Fitting Accuracy (% of joints meeting specifications)
- Time taken for Fitting (hours per project)
- Quality of Joints (measured by inspections)
- Adherence to Blueprints (% compliance)
- Equipment Maintenance and Care

KRAs:
- Fitting Precision
- Efficiency and Timeliness
- Adherence to Standards
- Continuous Skills Development
- Equipment Management

Sample Format:
KPI: Fitting Accuracy
Target: 98%
Actual: 99%
Variance: +1%

KPI: Time taken for Fitting
Target: 50 hours per project
Actual: 48 hours per project
Variance: -2 hours

Painter:

KPIs:
- Surface Preparation Efficiency
- Paint Coverage and Finish Quality
- Waste Management (paint usage per project)
- Safety Compliance
- Adherence to Paint Specifications

KRAs:
- Surface Preparation Excellence
- Paint Application Proficiency
- Safety and Environmental Compliance
- Material Management
- Quality Assurance

Format:
KPI: Surface Preparation Efficiency
Target: 90%
Actual: 92%
Variance: +2%

KPI: Paint Coverage and Finish Quality
Target: 95%
Actual: 96%
Variance: +1%

KPI: Waste Management
Target: 5% wastage per project
Actual: 4% wastage per project
Variance: -1%

Welder:

KPIs:
- Weld Quality (measured by inspections)
- Welding Speed (inches or meters per hour)
- Welding Accuracy (% compliance with specifications)
- Safety Incidents (number of incidents)
- Equipment Maintenance and Care

KRAs:
- Welding Excellence
- Efficiency and Productivity
- Safety and Compliance
- Equipment Handling

Sample Format:
KPI: Weld Quality
Target: 98%
Actual: 99%
Variance: +1%

KPI: Welding Speed
Target: 12 inches per hour
Actual: 14 inches per hour
Variance: +2 inches per hour

KPI: Safety Incidents
Target: 0 incidents
Actual: 1 incident
Variance: -1 incident

Helper:

KPIs:
- Support to Fabrication Team
- Time taken to Complete Assigned Tasks
- Safety Awareness
- Material Handling Efficiency
- Communication and Coordination Skills

KRAs:
- Effective Support to Fabrication Process
- Timeliness and Efficiency
- Safety Consciousness
- Material Handling Expertise
- Team Collaboration

Sample Format:
KPI: Support to Fabrication Team
Target: 90%
Actual: 92%
Variance: +2%

KPI: Time taken to Complete Assigned Tasks
Target: 4 hours per task
Actual: 3.5 hours per task
Variance: -0.5 hours

Foreman:

KPIs:
- Team Productivity and Output
- Safety Compliance
- Project Planning and Execution
- Resource Management (labor, materials, equipment)
- Communication and Leadership Skills

KRAs:
- Team Performance
- Safety and Compliance Oversight
- Project Management
- Resource Allocation and Utilization
- Leadership and Communication

Sample Format:
KPI: Team Productivity and Output
Target: 120% of monthly goal
Actual: 130% of monthly goal
Variance: +10%

KPI: Safety Compliance
Target: 100% adherence
Actual: 98% adherence
Variance: -2%

Remember, adjust them based on the specific goals and objectives of your steel fabrication operation. Additionally, involve your team in the process to ensure the KPIs are realistic and achievable.

Regards,