One fatal accident happened at PGCIL (Power Grid Corporation of India Limited) (Contractor - Jyoti Power) Aurangabad Stringing work site, in which 4 workers died and 2-3 workers were seriously injured. This accident happened during the final sag operation, in which the dead-end tower (nearby gantry) collapsed and four workers who were working on the tower were crushed between the collapsed tower.
Following are the probable causes of the accident:
1. Backstay not given to the dead-end tower.
2. Over-sagging resulting in the collapse of the tower.
3. Final sag operation was carried out with two tractors.
4. Winch machine usage was not in operation.
5. The tower was not fully tightened.
Preventive Measures to stop this unsafe condition:
1. Backstay shall be fixed at least 1.5 times (height of the tower) before the start of stringing work.
2. The depth of the dead man pit should be 6 feet, and the minimum diameter of the dead man wood should be 12 - 14 inches.
3. Double backstay arrangement may be given to strengthen the backstay.
4. A minimum 18 - 20 mm diameter steel wire rope shall be used for the backstay lead.
5. Final checking of the tower must be done before the start of stringing activity.
6. Use of the winch machine.
Therefore, please take necessary precautions during stringing work and suggest the same to the team. This is for your kind information and necessary action, please.
FYI
One fatal accident happened at PGCIL (Power Grid Corporation of India Limited) (Contractor - Jyoti Power) Aurangabad Stringing work site, in which 4 workers died and 2-3 workers were seriously injured. This accident happened during the final sag operation, in which the dead-end tower (nearby gantry) collapsed and four workers who were working on the tower were crushed between the collapsed tower.
Following are the probable causes of the accident:
1. Backstay not given to the dead-end tower.
2. Over-sagging resulting in the collapse of the tower.
3. Final sag operation was carried out with two tractors.
4. Winch machine usage was not in operation.
5. The tower was not fully tightened.
Preventive Measures to stop this unsafe condition:
1. Backstay shall be fixed at least 1.5 times (height of the tower) before the start of stringing work.
2. The depth of the dead man pit should be 6 feet, and the minimum diameter of the dead man wood should be 12 - 14 inches.
3. Double backstay arrangement may be given to strengthen the backstay.
4. A minimum 18 - 20 mm diameter steel wire rope shall be used for the backstay lead.
5. Final checking of the tower must be done before the start of stringing activity.
6. Use of the winch machine.
Therefore, please take necessary precautions during stringing work and suggest the same to the team. This is for your kind information and necessary action, please.