Dear Manjunath, Sorry for the inconvenience as my previous post could not be completed and got uploaded by mistake. What I meant was:
1. During procurement, the Hydropressure test is to be conducted usually at 1.5 times the working pressure.
2. This is witnessed by the customer, or else the supplier can send their Test Certificate (TC).
3. The vessels can be manufactured by IS standard, ANSI, or ASME. The weld tests and acceptance norms are specified.
4. The customer may also insist on tests like RT (Radiography Test), UT (Ultrasonic Test), or Magnetic Particle Test.
5. In addition, the basic steel plates can be of IS 2062 standard, BQ (Boiler Quality), or ASME grades. The manufacturer has to produce the Test Certificates from the Steel Plant with its identification number.
Once the above quality checks are taken care of, the pressure vessel can be tested by a competent person after 6 months as per provisions given in the Factories Act.
Hope this will help you. In case you need any more information, please let us know.
Thanks & Regards, Sudhir