Documents Maintaine At Building Construction Site

R.Balagopal
Dear sirs'
Kindly advise what documents to be kept at building construction sites for our records?(eg.fire register,tool box talk register etc..)
Thanks and regards,
R.Balagopal.
raghuvaran chakkaravarthy
Dear Balagopal,
I'm not sure about factory act 1948 about record maintaining in sites. As per International standard at least minimum we need to keep those below mentioned records in site all times.
Safety plan (Its includes all plans only site specific plans)
Training records
MSDS inventory records
Hazardous material list
Checklist for equipment and site inspection log.
Reference documents i.e OSHA 1926 hard copy or electronic copy if its a electronic copy all employees need to get access all times.
Accident/Incident/Nearmiss records
Manhour reports etc..,,,
Team,
If anybody provide the factory act reference to Mr.Balagopal it will be much appreciated.
R.Balagopal
Dear sir,
How to conduct risk assessment?What are the terms SHE,mitigation and Ops procedure?How to calculate risk factor from severity,probability,frequency?
Thanks,
Balagopal.R
carlyharris
You can ref some interview questions as follows:
Tell me about yourself?
What are your biggest strengths for Teacher?
Why did you leave your last job?
What are your career goals for Teacher?
What kind of salary would you require to accept the position: Teacher?
Why should we hire you over the other candidate?
What is your system for evaluating student work?
What would be the ideal philosophy of a school for you?
What have been your most positive teaching experiences?
Could a student of low academic ability receive a high grade in your classes?
You can ref more 170 teacher interview questions & answers at: azjobebooks.info/170-teacher-interview-questions or 103 common interview questions and answers.
Rajeev Vashishtha
Dear R.Balagopal
List of document required to maintain at construction site.
1. Labour payment register- Wages register including PF detail
and ensure to follow all rules and regulation under Labour Act.
2. Cement record full detail cement brought at site and consumption according to permissible limit.
3. Material bought at site other then cement.
4. Material Test Reports register
5. Hindrance register.
6. Instruction register ( From EIC work)
If you are knowledgeable about any fact, resource or experience related to this topic - please add your views. For articles and copyrighted material please only cite the original source link. Each contribution will make this page a resource useful for everyone. Join To Contribute