Dear Sirs,
Severity rate at our construction was 0.55. Unfortunately, a fatal accident occured and worker lost his life.
So, before the fatal accident, the lost mandays were 2 and manhours worked were 3636836. so by formula of
Severity rate = No. of manday lost x 1000000 / Manhours worked = 2 x 1000000 / 3636836 = 0.5499.
So, now after the worker fatal accident, the serverity rate will be as follows;
SR = 2 x 6000 x 1000000 / 3636836 = 3299 .
for the above I have 2 questions:
1. the above calculation is correct i.e 3299 SR?.
2. What SR value we should maintain at site like 0.1 or 0.2 or (0.1 to 1 is no acceptable etc)
Please reply seniors.