Hi All,
Pls find below KRA Examples for Warehouse Professionals:-
A-Functional Performance Focus:-
i. To ensure that the vehicle unloading is done within 3 hours of reporting
ii. To ensure PGR is done on the same day of goods received ,if IBD is availabale.
iii. To report discrepancy / damage in the goods within 24 hours of receipt
iv. To ensure put away is done within one hour of unloading as per warehouse layout & 100% stacking norms followed as per approved guidelines
v. To ensure execution & despatch of local orders received upto 1200 hrs and upcountry orders upto 1400 hrs and nil BND
vi. To ensure MTR updation against all the despatches within 48 hours of despatch
vii. To ensure stock in transit is not pending in the system for more than 20 working days
i. To ensure PI1 on daily basis for Minimum 25 Articles Received / Dispatched Previous Day and MIS sent to HO - SCM
ii. To ensure stock variation is less than 0.01% of sale in any PSV2
iii. To ensure not more than 10% of blocked stocks is more than 60 days old
iv. To ensure 100% defective materials received by the 20th of every month are returned to vendors by the 25th of the month
"v. To ensure replacement of
a. same model (ZAA) within 3 days and
b.alternate models (ZAB) within 7 days
for local & upcountry dealers
c. Nil Pending Replacement at Monthend"
vi. To ensure nil MTR pending for collection for more than 7 days
vii. To ensure unmatched stock is not more than 0.25% of monthly average sale
B-Operational Efficiency:-
i. To ensure cost reduction of atleast 10% in secondary transportation over last year
"i. To ensure submission of :
a. RDT-I and RDT-II reports (weekly)
b. DUO statements (2nd of every month)
c. Final reconciliation on quarterly stock verification report within 10 days of stock verification"
i. To ensure maintenance of fire extinguishers once in six months and refilling as per manufacturing norms
ii. To ensure fire and first-aid training for team members once in every six months
i. To Ensure the proper maintenance of MHEs available in warehouse / Reducing the Breakdown timings
i. To ensure waste & scrap disposal weekly
ii. To maintain cleanliness within the premises and send photographs weekly to HO-SCM
Hope is it clear to all need further assistance feel free to call me.
Thanks | ASLAM KHAN
Team | SCM
Usha International Ltd
+91-8602359021