Dear sirs' Kindly advise what documents to be kept at building construction sites for our records?(eg.fire register,tool box talk register etc..) Thanks and regards, R.Balagopal.
From Oman
From Oman
Dear Balagopal,
I'm not sure about the Factory Act of 1948 regarding record maintenance on sites. According to international standards, we need to maintain the following records at all times on site:
- Safety plan (including all site-specific plans)
- Training records
- MSDS inventory records
- Hazardous material list
- Checklist for equipment and site inspection log
- Reference documents such as OSHA 1926 (either hard copy or electronic copy; if electronic, all employees must have access at all times)
- Accident/Incident/Near miss records
- Man-hour reports, etc.
Team,
If anyone can provide the Factory Act reference to Mr. Balagopal, it would be greatly appreciated.
From United States, Fpo
I'm not sure about the Factory Act of 1948 regarding record maintenance on sites. According to international standards, we need to maintain the following records at all times on site:
- Safety plan (including all site-specific plans)
- Training records
- MSDS inventory records
- Hazardous material list
- Checklist for equipment and site inspection log
- Reference documents such as OSHA 1926 (either hard copy or electronic copy; if electronic, all employees must have access at all times)
- Accident/Incident/Near miss records
- Man-hour reports, etc.
Team,
If anyone can provide the Factory Act reference to Mr. Balagopal, it would be greatly appreciated.
From United States, Fpo
Dear sir, How to conduct risk assessment?What are the terms SHE,mitigation and Ops procedure?How to calculate risk factor from severity,probability,frequency? Thanks, Balagopal.R
From Oman
From Oman
Dear R. Balagopal,
List of documents required to maintain at a construction site:
1. Labour payment register: Wages register including PF details and ensure to follow all rules and regulations under the Labour Act.
2. Cement record: Full details of cement brought to the site and consumption according to permissible limits.
3. Materials bought at the site other than cement.
4. Material Test Reports register.
5. Hindrance register.
6. Instruction register (From EIC work).
From India, Ghaziabad
List of documents required to maintain at a construction site:
1. Labour payment register: Wages register including PF details and ensure to follow all rules and regulations under the Labour Act.
2. Cement record: Full details of cement brought to the site and consumption according to permissible limits.
3. Materials bought at the site other than cement.
4. Material Test Reports register.
5. Hindrance register.
6. Instruction register (From EIC work).