Cite.Co is a repository of information and resources created by industry seniors and experts sharing their real world insights. Join Network
Dear All. I have Course Material About 5’S'.I think it is helpful for you.please find attached file Regards, Abhijeet Chavan

Attached Files
Membership is required for download. Create An Account First
File Type: pdf 5 S Course Material.pdf (240.9 KB, 320 views)
File Type: pdf 5'S' Board.pdf (220.0 KB, 276 views)

Dear All, Please find attached PPT and revert with your comments. Regards, Priya.

Attached Files
Membership is required for download. Create An Account First
File Type: pps 5 s.pps (471.0 KB, 277 views)

Sir,
Its not my creation..I just got the stuff from net. Thanks for sharing the info that this could have landed me up with bad scenario.
However, I would like to add my very own PPT on Team Building In Hindi Version With Lego Games.
Your Kind comments are appreciative.
Regards,
Priyanka.

Please find the attachment on LEAN MANAGEMENT in VIYELLATEX Group Bangladesh. 5s is the part of lean manufacturing. Find the concept to implement.
Thanks,
Md. Emdadul Karim
Asst. Manager, Training & Development
VIYELLATEX group
Bangladesh
Cell: +88 01710513858
e-mail:


Attached Files
Membership is required for download. Create An Account First
File Type: pdf Basic Concepts on Lean Manufacturing _final_.pdf (1.51 MB, 280 views)

We also trade sign boards and safety signages.
Our offered products are world class which lead to
ultimate client satisfaction
SIGN BOARDS
Matching the requirements of our clients we are engaged in offering a
wide range of Sign Boards for our prestigious clients. These are
manufactured using latest technology and optimum quality of material.
CONTACT US
Team Engineering
Contact Person: Mr. Rajasekar
No. 5, Muthumariamman Koil Street, Moogileri, Pammal
Chennai - 600075, Tamil Nadu, India
Cell:9962657253
Email:
Spare Parts - Plastic Mold Product and Blow Mold Products Manufacturer and Supplier | Team Engineering, Chennai

The 5S methodology is typically implemented using a 3-step process, which includes establishing a cross functional team (including employees that work in the associated areas), touring all areas associated with manufacturing process under review, and brainstorming on ways to improve organization to reduce waste.

This discussion thread is closed. If you want to continue this discussion or have a follow up question, please post it on the network.
Add the url of this thread if you want to cite this discussion.






About Us Advertise Contact Us
Privacy Policy Disclaimer Terms Of Service



All rights reserved @ 2020 Cite.Co™